Steel structure is actually a lightning protection net bird's nest, water cube can fight a magnitude 8 earthquakeIn "steel" of the national stadium (bird's nest), can withstand the test of lightning? In the recently published "hi-tech Olympics ─ ─ analytical ideas of science and technology of Beijing Olympic Games a book reveal in detail the" bird's nest, water cube, "lightning protection, seismic technology. Revealed in the book, the "bird's nest" appearance is smooth, no ordinary of lightning rod on big construction, in fact, it's the whole "steel" constitutes the ideal "cage lightning protection net".
Steel Structure Warehouse http://www.jingtabuilding.com/steel-structure-workshop.html of lightning protection does not hurt the audience
Revealed in the book, "bird's nest" design of the lightning protection is not mysterious, just make full use of the favorable conditions of building structure itself. Designer metal roof will be the "bird's nest" of the steel components, steel structure and reinforced concrete reinforcement, effectively connected by welding way, so that the "bird's nest" itself is formed a huge lightning protection network, the "bird's nest" of the steel structure has been a huge receiving lightning device, can put the lightning quick import underground.
"Bird's nest" steel structure receives the lightning itself, will not affect the safety inside the "bird's nest"? Explained in the book, in order to prevent lightning damage to human body, venues, my wife can touch place, such as steel structure, do the special handling, offset the effect of lightning to the person, never hurt people; At the same time, the "bird's nest" in almost all of the devices are connected to the lightning protection network for reliable, ensure that lightning coming moment, smooth will be huge current through the ground, to ensure the venue itself, equipment and personal safety.
Water cube can fight a magnitude 8 earthquake
Appearance of bubble water cube, no sharp lightning rod shaft near the venue, the bubble can also lightning protection? Revealed in the book, the original underground and basic part of the water cube is a reinforced concrete structure, the floor is steel space frame, steel welded together, the rack and the underground in reinforced concrete is formed a cube of cage, the lightning protection network structure material completely on its own, as a wire connected to the ground, no longer separate lightning rod, can make the thunder into the underground.
The most special is, the water cube and effeminate, there are 12000 bearing nodes, these nodes can evenly bear the weight of the building. At the same time, the water cube to Shanghai underground reinforced concrete structure and fully welded together, the whole venue as a whole, to fight against a magnitude 8 earthquake standards.
1 the "bird's nest" surface no general lightning rod on big construction. Its steel structure are connected through a welding way, being attacked by a lightning, Steel Structure Warehouse has become a huge receiving lightning device.
2 in order to prevent lightning damage to human body, venues, my wife can touch place, do the special handling, offset the lightning effects on people, won't hurt people.
3 "bird's nest" in almost all of the devices are connected to the lightning protection network for reliable, thunder and lightning coming moment, smooth will be huge current through the ground, to ensure the venue itself, equipment and personal safety.
Source: Beijing news
The development trend of fire retardant coating of steel structure
http://chinasteelframe.blogspot.com/2013/04/the-development-trend-of-fire-retardant.html
2013年4月25日星期四
2013年4月22日星期一
"Bird's nest" national stadium steel structure
"Bird's nest" national stadium steel structure first hoisting successsteel structure disgn With the construction of the difficulty of the national Steel Structure Building disgn Has experienced a long process, from concept design to design, from the roof can be opened, to cancel the open roof, roof openings. The "bird's nest" scheme of weaving shape steel structure modelling is unique, but greatly improve the construction difficulty accordingly. Maximum cross section truss column x 20 m, 25 m height is 67 m, single heaviest cross 600 tons. Main truss height of 12 m, the double cross through the largest span of 258.365 m, component size, heavy weight monomers. To decrease the difficulty of components assembled truss column USES lie to spell, will use the main truss flat spelling (inner ring main truss stand spell except), so that component of the vertical lifting, hoisting in place extremely hard and high stability. And facade secondary structure weight is relatively small, but oddly shaped, and tilt outward, operation platform, and it is difficult to set and stability measures.
Shanghai treasure smelting construction national stadium project department would make each project is the project's concept, all up and down together, overcome difficulties, to overcome technical difficulties one by one, make sure that the first piece of truss column hoisting on schedule, to treasure smelting construction fired the first shot in the construction of the national stadium, also treasure smelting Steel Sheds http://www.jingtabuilding.com/steel-sheds.html of the construction of the brand to a heavy sum.
Construction steel structure
http://steelstructurebuilding.blogspot.com/2013/04/construction-steel-structure.html
Shanghai treasure smelting construction national stadium project department would make each project is the project's concept, all up and down together, overcome difficulties, to overcome technical difficulties one by one, make sure that the first piece of truss column hoisting on schedule, to treasure smelting construction fired the first shot in the construction of the national stadium, also treasure smelting Steel Sheds http://www.jingtabuilding.com/steel-sheds.html of the construction of the brand to a heavy sum.
Construction steel structure
http://steelstructurebuilding.blogspot.com/2013/04/construction-steel-structure.html
2013年4月17日星期三
Steel structure enterprise's development and countermeasuressteel structure
Steel structure enterprise's development and countermeasuressteel structure disgn Level unceasing enhancement, a large number of advanced technology and application of special materialssteel structure disgn Bright spot, and large span and large space, the application of new structure of large tonnage, also for the steel structure installation construction enterprise has brought unprecedented challenges. How to stand out in competition has become numerous construction steel structure enterprise deeply and strive to explore new topics. At present, China's Steel Structure Warehouse enterprise after years of hard work and work, its development model by the previous several years of exploration development in the growth period, growing period, mature period, some companies have professional construction level, has the design, installation team and highly efficient management talent, but actually has a set design, production, installation, technical advice and new product research and development in a body's modernized enterprise, after all, is one of the few.
Current steel structure industry in China is approaching period of evolution, it is because of the formation of this situation, the enterprise brand awareness is not strong, is bound to be at a disadvantage position in the fierce competition in the market. The personage inside course of study are understood, in the home appliance industry rapid development, most of construction enterprises haven't realized the importance of branding. Only put themselves into the big market, often listen to the voice of the market, pay attention to improve their core competitiveness, to achieve a qualitative breakthrough, win the future Warehouse Building http://www.jingtabuilding.com/steel-structure-warehouse.html market. Jiang Jixing xian zhong
Steel structure steel 1 # blast furnace hot blast stove overhaul
http://chinasteelframe.blogspot.com/2013/04/steel-structure-steel-1-blast-furnace.html
Current steel structure industry in China is approaching period of evolution, it is because of the formation of this situation, the enterprise brand awareness is not strong, is bound to be at a disadvantage position in the fierce competition in the market. The personage inside course of study are understood, in the home appliance industry rapid development, most of construction enterprises haven't realized the importance of branding. Only put themselves into the big market, often listen to the voice of the market, pay attention to improve their core competitiveness, to achieve a qualitative breakthrough, win the future Warehouse Building http://www.jingtabuilding.com/steel-structure-warehouse.html market. Jiang Jixing xian zhong
Steel structure steel 1 # blast furnace hot blast stove overhaul
http://chinasteelframe.blogspot.com/2013/04/steel-structure-steel-1-blast-furnace.html
2013年4月14日星期日
Xuzhou held a big spansteel structure workshopBig fire fighting
Xuzhou held a big spansteel structure workshopBig fire fighting and rescue drills
Fire units to improve actual combat ability of fire fighting and rescue work, rich experience place full time fire brigade disposal of disasters and accidents, the morning of September 11,, jiangsu xuzhou city fire team, Peng Cheng power plant, xuzhou power plant, as well as in large span xuzhou hua yi printing co., LTDThe china steel structureworkshopFire fighting and rescue joint exercises.
9 when 30 points, the official start of the exercise. Large span drills hypothesis of xuzhou hua yi printing co., LTDThe Steel Workshop http://www.jingtabuilding.com/steel-structure-workshop.html On fire and the fire spread quickly and endanger neighboring tobacco warehouse with print, factory and workers are trapped in reservoir.
Detachment command center called immediately after the launch plan, fire fighting and rescue area of meng home quickly assemble ditch over 20 squadron fire truck, fire officers and soldiers rushed to the scene disposal. Team on duty of head, the commander immediately to the scene, at the same time assemble a secret squadron, Yang Zhuang squadron, Hou Shan walter squadron, full time fire brigade Peng Cheng power plant, xuzhou power plant 12 full time fire brigade fire truck more than 60 fire officers and soldiers in reinforcements. Teams according to fire fighting and rescue preplan on fast fight fire fighting and rescue work, and organize the evacuation factory district and surrounding areas the masses. At 55 points, the fire was completely put out, all save, end of drills.
China steel industry base 10steel structure
http://steelstructurebuilding.blogspot.com/2013/04/china-steel-industry-base-10steel.html
Fire units to improve actual combat ability of fire fighting and rescue work, rich experience place full time fire brigade disposal of disasters and accidents, the morning of September 11,, jiangsu xuzhou city fire team, Peng Cheng power plant, xuzhou power plant, as well as in large span xuzhou hua yi printing co., LTDThe china steel structureworkshopFire fighting and rescue joint exercises.
9 when 30 points, the official start of the exercise. Large span drills hypothesis of xuzhou hua yi printing co., LTDThe Steel Workshop http://www.jingtabuilding.com/steel-structure-workshop.html On fire and the fire spread quickly and endanger neighboring tobacco warehouse with print, factory and workers are trapped in reservoir.
Detachment command center called immediately after the launch plan, fire fighting and rescue area of meng home quickly assemble ditch over 20 squadron fire truck, fire officers and soldiers rushed to the scene disposal. Team on duty of head, the commander immediately to the scene, at the same time assemble a secret squadron, Yang Zhuang squadron, Hou Shan walter squadron, full time fire brigade Peng Cheng power plant, xuzhou power plant 12 full time fire brigade fire truck more than 60 fire officers and soldiers in reinforcements. Teams according to fire fighting and rescue preplan on fast fight fire fighting and rescue work, and organize the evacuation factory district and surrounding areas the masses. At 55 points, the fire was completely put out, all save, end of drills.
China steel industry base 10steel structure
http://steelstructurebuilding.blogspot.com/2013/04/china-steel-industry-base-10steel.html
2013年4月11日星期四
The Olympic tower
The Olympic tower, multi-function studiosteel structure engineeringopenwork
Beijing Olympic park tower multi-function studioSteel structure constructionRecently started. Beijing construction machinery company is responsible for the light steel structure engineeringThe construction.
Olympic park tower multi-function studio for television, the main functions of studio tower a total height of 128 meters, gross tonnage of 2000 tons of steel structure, but here in the tower height is 99.6 m. Tower is divided into 7 layer, each layer of the distance between the tower is 13.6 meters. First floor tower to expand an equilateral triangle, for rest hall or big studios, building area of 1000 square meters. 2 to 6 storey tower for the studio, tentative top tower for the VIP tourism agency. Each standard storey tower is an equilateral triangle, flat side length is 21 meters.
Learned of multi-function studio tower design elements, the traditional Chinese architectural culture tower with steel structure and glass curtain wall and other advanced technology and modern abstract express lightsome, exquisite pen, transparent, etc. The characteristics of the tower, and the use of metal and glass glittering and translucent color, create a strong visual impact.
The project complex Steel Structure Warehouse http://www.jingtabuilding.com/steel-structure-workshop.html installation is difficult. Large amounts of heat applied to complete the square tube and cast steel nodes, structure plane size is small, the tower height is big, strict hoisting. Studio tower structure belongs to the towering structure, this structure under wind load or horizontal load, the dynamic response is larger.
Broadcast tower structure Angle of cone surrounding the steel column and floor beam and floor beam, large roofing cant beam intersecting node, stress is very concentrated, component quantity is more, complex component cross section and the intersection Angle, with great difficulty to installation, welding and spatial orientation.
Construction unit to send chosen men will form a project department, formulate scientific and rigorous construction schemes, structure of December this year is expected to complete the construction.
Joining hundreds welder nest steel structure steel plate the 10 centimeters
http://chinasteelframe.blogspot.com/2013/04/joining-hundreds-welder-nest-steel.html
Beijing Olympic park tower multi-function studioSteel structure constructionRecently started. Beijing construction machinery company is responsible for the light steel structure engineeringThe construction.
Olympic park tower multi-function studio for television, the main functions of studio tower a total height of 128 meters, gross tonnage of 2000 tons of steel structure, but here in the tower height is 99.6 m. Tower is divided into 7 layer, each layer of the distance between the tower is 13.6 meters. First floor tower to expand an equilateral triangle, for rest hall or big studios, building area of 1000 square meters. 2 to 6 storey tower for the studio, tentative top tower for the VIP tourism agency. Each standard storey tower is an equilateral triangle, flat side length is 21 meters.
Learned of multi-function studio tower design elements, the traditional Chinese architectural culture tower with steel structure and glass curtain wall and other advanced technology and modern abstract express lightsome, exquisite pen, transparent, etc. The characteristics of the tower, and the use of metal and glass glittering and translucent color, create a strong visual impact.
The project complex Steel Structure Warehouse http://www.jingtabuilding.com/steel-structure-workshop.html installation is difficult. Large amounts of heat applied to complete the square tube and cast steel nodes, structure plane size is small, the tower height is big, strict hoisting. Studio tower structure belongs to the towering structure, this structure under wind load or horizontal load, the dynamic response is larger.
Broadcast tower structure Angle of cone surrounding the steel column and floor beam and floor beam, large roofing cant beam intersecting node, stress is very concentrated, component quantity is more, complex component cross section and the intersection Angle, with great difficulty to installation, welding and spatial orientation.
Construction unit to send chosen men will form a project department, formulate scientific and rigorous construction schemes, structure of December this year is expected to complete the construction.
Joining hundreds welder nest steel structure steel plate the 10 centimeters
http://chinasteelframe.blogspot.com/2013/04/joining-hundreds-welder-nest-steel.html
2013年4月9日星期二
Shanghai installation stand structure NongYunHui
Shanghai installation stand structure NongYunHui stadium yesterday76 - meter - high crane arm, slowly lift the box girder steel components of 33 meters high. Yesterday, quanzhou channel sport center competition venues, Shanghai began to install the audience stand structure, adopted the technology of the cantilever box girder construction of sports venues, which are rare in the whole province.
18 points and 11 o 'clock at noon yesterday, the construction workers began installing venues area of three axis of steel members. The china steel structure engineeringDesign for box girder structure, a total of about 4300 tons, the largest box beam weight of 61 tons, up to 43 m, span 47 m. Project project manager department Du Junsheng, above the playground design 44 total root length different curved steel components, around the venue over a week, most of the more than 60 tons, the lightest steel members have more than ten tons. The steel components mainly support the roof.
After steel members lift, worker immediately began to use bolt welding. Is responsible for the installation of steel members Xia Kejian said chief engineer, to fix a few tons of artifacts that need to be more than 20 more than 200 kilograms of bolt, the nut also weighed 2.5 to 3 kg. Progress of fixed Steel Sheds http://www.jingtabuilding.com/steel-sheds.html is installed two days about 3 root, fight for the end of July the installation is complete, the next for the curtain wall installation and venues other decoration work.
Jiang Yukun strait sports center office, told reporters that $670 million to build the channel quanzhou city sports center, the body of the strait sports center construction will be completed by December 31, 2007; In March 2008 will finish, both inside and outside decoration and related projects; On October 26, 2008, will be the 2008 sixth national NongYunHui stadium. At that time, the center of the stadium, stadium, a total can accommodate nearly 40000 people. At the same time, the center of citizen sports square will be completely open, be a good place for recreation.
"uNing beads" xining television tower steel structure main body capsOn October 8th
http://steelstructurebuilding.blogspot.com/2013/04/uning-beads-xining-television-tower.html
18 points and 11 o 'clock at noon yesterday, the construction workers began installing venues area of three axis of steel members. The china steel structure engineeringDesign for box girder structure, a total of about 4300 tons, the largest box beam weight of 61 tons, up to 43 m, span 47 m. Project project manager department Du Junsheng, above the playground design 44 total root length different curved steel components, around the venue over a week, most of the more than 60 tons, the lightest steel members have more than ten tons. The steel components mainly support the roof.
After steel members lift, worker immediately began to use bolt welding. Is responsible for the installation of steel members Xia Kejian said chief engineer, to fix a few tons of artifacts that need to be more than 20 more than 200 kilograms of bolt, the nut also weighed 2.5 to 3 kg. Progress of fixed Steel Sheds http://www.jingtabuilding.com/steel-sheds.html is installed two days about 3 root, fight for the end of July the installation is complete, the next for the curtain wall installation and venues other decoration work.
Jiang Yukun strait sports center office, told reporters that $670 million to build the channel quanzhou city sports center, the body of the strait sports center construction will be completed by December 31, 2007; In March 2008 will finish, both inside and outside decoration and related projects; On October 26, 2008, will be the 2008 sixth national NongYunHui stadium. At that time, the center of the stadium, stadium, a total can accommodate nearly 40000 people. At the same time, the center of citizen sports square will be completely open, be a good place for recreation.
"uNing beads" xining television tower steel structure main body capsOn October 8th
http://steelstructurebuilding.blogspot.com/2013/04/uning-beads-xining-television-tower.html
2013年4月6日星期六
The Olympic beach volleyball arenasteel structure
The Olympic beach volleyball arenasteel structure engineeringWill start
Message of yesterday, Beijing urban construction for both company are to be borne by the construction of the Olympic beach volleyball in chaoyang park home and 1 warm up light steel structure www.jingtabuilding.com engineeringThe construction, the project the main structure is light steel frame and steel frame structure, is one of the 2008 Olympic Games beach volleyball temporary venues.
It is understood that the whole game sites including a main playground, two warm-up games and six blocks of courses, set the audience seats 12000, planning covers an area of 15 hectares.Steel Structure Workshop engineeringCompleted by the end of this year, and the whole project will be completed in August next year.
The beauty of steel building
http://chinasteelframe.blogspot.com/2013/04/the-beauty-of-steel-building.html
Message of yesterday, Beijing urban construction for both company are to be borne by the construction of the Olympic beach volleyball in chaoyang park home and 1 warm up light steel structure www.jingtabuilding.com engineeringThe construction, the project the main structure is light steel frame and steel frame structure, is one of the 2008 Olympic Games beach volleyball temporary venues.
It is understood that the whole game sites including a main playground, two warm-up games and six blocks of courses, set the audience seats 12000, planning covers an area of 15 hectares.Steel Structure Workshop engineeringCompleted by the end of this year, and the whole project will be completed in August next year.
The beauty of steel building
http://chinasteelframe.blogspot.com/2013/04/the-beauty-of-steel-building.html
2013年4月1日星期一
To undertake overseassteel structure engineeringstrictRecently
To undertake overseas china steel structure engineeringstrictRecently, housing and urban-rural development, ministry of commerce, the ministry of foreign affairs, national development and reform commission, ministry of finance, state-owned assets supervision and administration, state administration of work safety and other departments jointly issued notice, on May 1 to December 31, to carry out the comprehensive implementation of the "regulations on the administration of foreign contracted projects" (hereinafter referred to as the regulations) special inspection.
The special inspection has four purposes: one is to further strengthen the regulations of the publicity, organization enterprise earnestly study the regulations, to deepen the understanding of the regulations, give full play to in the regulations to improve enterprise management level, enhance comprehensive competitiveness of enterprises, implementation of brand strategy, pioneering guiding role in the international market; 2 it is to urge enterprises to enhance comprehensive implementation of the initiative and creativity of the regulations, seriously study the regulations, be familiar with the contents of the regulations, seriously control checking, the regulations consciously correct the deviation in the operation and management, eliminate hidden dangers and raise the level of operation and management; 3 is a summary enterprise facing the difficulties and problems, supervise and urge all departments and units to perfect the service guarantee and risk control system, and focus on according to the regulations to perfect the policy to promote the development of foreign contracted projects; Four is to shift focus to further transformation of the mode of growth, improve the level of business, the enhancement enterprise in the development of science and sustainability.
The special inspection of the key is: enterprise whether to perform the contract according to the requirements of the regulations, implement the safety production responsibility, safeguard the rights and interests of dispatched workers, fulfill social responsibility, etc., if there is not obey industry organization and coordination, subcontract or layers of the subcontract project, bidding projects according to the provisions of the permit, etc.
Special inspection of the combined enterprise self checking and government spot check way, divided into in-depth analysis study, improve improve, summarizes several stages.
In recent years, China's foreign contracted projects has developed rapidly, expanding scale, become one of the main methods of foreign investment cooperation, to promote national economic development and expand the opening to the outside world has played an important role. Under the background of the international financial crisis, in 2009, China's foreign contracted projects signed new contracts can be as high as $126.2 billion, turnover of $77.7 billion, year-on-year growth of 20.7% and 37.3%, respectively, to stabilize the external demand, maintain growth, promote employment made a positive contribution.
To regulate foreign contracted project management, on September 1, 2008 officially issued and implemented the foreign contracting project management ordinance, for foreign contracted projects implementation of scientific development provides the legal and institutional guarantee.
Shanghai towersteel structure engineeringIn the appropriate
workYesterday
http://steelstructurebuilding.blogspot.com/2013/03/shanghai-towersteel-structure.html
The special inspection has four purposes: one is to further strengthen the regulations of the publicity, organization enterprise earnestly study the regulations, to deepen the understanding of the regulations, give full play to in the regulations to improve enterprise management level, enhance comprehensive competitiveness of enterprises, implementation of brand strategy, pioneering guiding role in the international market; 2 it is to urge enterprises to enhance comprehensive implementation of the initiative and creativity of the regulations, seriously study the regulations, be familiar with the contents of the regulations, seriously control checking, the regulations consciously correct the deviation in the operation and management, eliminate hidden dangers and raise the level of operation and management; 3 is a summary enterprise facing the difficulties and problems, supervise and urge all departments and units to perfect the service guarantee and risk control system, and focus on according to the regulations to perfect the policy to promote the development of foreign contracted projects; Four is to shift focus to further transformation of the mode of growth, improve the level of business, the enhancement enterprise in the development of science and sustainability.
The special inspection of the key is: enterprise whether to perform the contract according to the requirements of the regulations, implement the safety production responsibility, safeguard the rights and interests of dispatched workers, fulfill social responsibility, etc., if there is not obey industry organization and coordination, subcontract or layers of the subcontract project, bidding projects according to the provisions of the permit, etc.
Special inspection of the combined enterprise self checking and government spot check way, divided into in-depth analysis study, improve improve, summarizes several stages.
In recent years, China's foreign contracted projects has developed rapidly, expanding scale, become one of the main methods of foreign investment cooperation, to promote national economic development and expand the opening to the outside world has played an important role. Under the background of the international financial crisis, in 2009, China's foreign contracted projects signed new contracts can be as high as $126.2 billion, turnover of $77.7 billion, year-on-year growth of 20.7% and 37.3%, respectively, to stabilize the external demand, maintain growth, promote employment made a positive contribution.
To regulate foreign contracted project management, on September 1, 2008 officially issued and implemented the foreign contracting project management ordinance, for foreign contracted projects implementation of scientific development provides the legal and institutional guarantee.
Shanghai towersteel structure engineeringIn the appropriate
workYesterday
http://steelstructurebuilding.blogspot.com/2013/03/shanghai-towersteel-structure.html
订阅:
博文 (Atom)