2013年3月31日星期日

Comprehensive interpretation experts

Comprehensive interpretation experts "technical code for light steel structure housing"In "technical code for light steel structure housing" section 3.1.2, 3.1.8, 4.4.3, article 5.1.4 ensuring, 5.1.5 five to mandatory provisions, shall be implemented strictly.

3.1.2 light steel structure with steel should have tensile strength, elongation, yield strength and the content of sulfur and phosphorus qualified assurance. For welding carbon steel bearing structure should have qualified of guarantee and the cold bending test qualified. For bearing structure with the requirements for seismic resistance of steel yield strength and tensile strength measured values, the ratio of the measured values should not be greater than 0.85, the elongation should not be less than 20%.

3.1.8 unworthy of reinforced fiber cement board and unworthy of reinforced cement aerated foam sheet class shall not be used for floor and wall body between the stairs.

4.4.3 exterior wall insulation board should be used outside the whole steel structure installation. When using fill steel frame type walls, exposed steel structure heat preservation and heat insulation of the outer part should be processing.

5.1.4 ensuring bearing capacity of light steel structure residential structures shall meet the following requirements:

No combination of seismic action & gamma; 0 sd & le; Rd with seismic action combination Sd≤ Rd / & gamma; RE. Type of & gamma; 0 for the structure importance coefficient, for general Light steel structure housing security level 2, when the design service life not less than 50 years, & gamma; Zero values should not be less than 1.0. Sd for the combined effect of the design value, should be stipulated in the "procedures" article 5.1.5 computational. Rd design value for resistance of structures or structural components. & gamma; RE for seismic adjustment coefficient of bearing capacity, according to the current national standard "code for seismic design of buildings (GB 50011 the provisions of the value.

5.1.5 function combination effect of design value should be determined by the following formula:

No combination of seismic action effect: Sd = & gamma; GSGk + & psi; Qγ QSQk + & psi; Wγ WSwk. Type of & gamma; G for permanent loads subentry coefficient, when the variable load control role, should take 1.2, when the permanent load control role should take 1.35, when gravity load effect is good for component bearing capacity should not be greater than 1.0. & gamma; Q for the floor live loads subentry coefficient, should take 1.4. & gamma; W subentry coefficient of wind load, should take 1.4. SGk standard values for the permanent load effect. SQk for floor surface effect of live load standard values. Swk standard for wind load effect. & psi; Q, & psi; W respectively floor surface live load effect combination coefficient, value coefficient and wind load effect combination when the permanent load control role should take 0.7 and 0.6 respectively, when the control variable load should be 1.0 and 0.6 or 1.0 and 0.6 respectively.

With combination of seismic action effect: Sd = & gamma; GSGE + & gamma; EhSEhk. Type of SGE to gravity load represents the effect of the standard value. SEhk for horizontal earthquake effect standard values. & gamma; Eh subentry coefficient for horizontal seismic effect, should take 1.3.

When calculating the deformation of combination effect of the standard should be adopted, namely formula Sd = & gamma; GSGk + & psi; Qγ Q

SQk + & psi; Wγ WSwk formula and Sd = & gamma; GSGE + & gamma; EhSEhk of subentry coefficient should be 1.0.

An emphasis on light

The regulation applies to frame of light Light steel structure for structure system, and form a complete set of meet the function requirements of lightweight wall, light, floor light roof and building system, is a light steel structure housing the design, construction and acceptance standard. An emphasis on light. Can be used in the seismic region of earthquake or not less than 6 layer of steel structure residential building. The apartments, and other construction use for reference. Need to point out is, light steel structure housing the design, construction and acceptance, besides should comply with the "procedures", should also comply with the provisions of the current relevant national standard.

Frame light steel structure is to point to by a small section of hot-rolled H section steel, high-frequency welding h-beam, ordinary welding h-beam or profiled steel, cold rolled or hot rolled forming of square or rectangular, round shaped steel tube of the pure frame or frames - support structure system. Combined with lightweight floor and use the wall favorable factors to resist lateral force, not only can make the steel weight of the steel structural frame structure system to save, also solved the technical problems of multi-level structure has been built, especially can be consistent with the current system of norms, meet the seismic requirements, is a kind of light steel structure residential system which accords with the situation of China.

Light steel structure residence is a kind of special building system, light steel structure housing design and construction of the material must have stability, weather resistance, durable, safe and reliable, economical and practical of form a complete set of lightweight enclosure materials and its supporting technology, which is connected with steel structure, especially the light connection of the wall and steel structure supporting technology. Due to its lightweight, structure performance is superior, the architectural layer and no more than 6 layer, easy to earthquake. As long as the auxiliary materials and technology to improve the fuel economy is better and convenient for popularization and application.

Light steel structure residence is a kind of new construction system, involving the material is new building materials, the design method is the integration of construction, structure, equipment, and decoration. This residential emphasized material matching, form a complete set of technology, design facilities, on the basis of enterprise development, dedicated system, according to "regulations" regulation for specific engineering design, construction and acceptance.

Ordinary steel structure with cast-in-place reinforced concrete floor slab structure systemSteel structure housing, should according to the relevant standards of the current design. The cold bending thin-wall steel low-rise residential buildings, should be executed according to its professional standards.

Construction acceptance and the regulations on the use of maintenance

Construction acceptance. Light steel structure housing projects should be on the basis of the construction general contracting unit self-check qualified, by the construction general contracting unit shall submit to the construction unit project completion report, apply for project completion acceptance. Project completion report must be signed by the general supervision engineer.

In construction quality acceptance, should according to the inspection batch and subentry engineering, division of son (or branch) engineering division, and should comply with the current national standard "architectural engineering construction quality acceptance standard" GB50300, the construction quality acceptance of steel structure engineering GB50205 and other relevant professional norms.

Clear procedures, acceptance of construction quality should meet the following requirements: special acceptance should be building energy efficiency, mainly includes the building shape coefficient and window wall area ratio, each part of the heat transfer coefficient of enclosure structure, external shading coefficient, etc., shall conform to the national standard for construction quality acceptance of building energy conservation engineering "GB50411 design documents and construction requirements; Each division (or a division) engineering quality shall be qualified; Quality control data shall be complete; Each division (or a division) engineering information on safety and function tests should be complete; Main function spot check result should comply with the relevant professional project quality acceptance of norms; Visual quality inspection should comply with the requirements.

The completion acceptance. Completion inspection and acceptance shall be issued by the construction unit to organize the implementation, the prospecting units, design units, supervision units, construction units should jointly participate.

The use and maintenance. Construction units consign is used, should provide residential instruction for use, home use instructions contained in the note shall comply with relevant provisions. Included in the main structure of the matters needing attention: steel structure cannot be dismantled, the coating layer may not be eradicated, decoration shall not be applied on the steel structure welding; Nonbearing wall wall cannot be dismantled, changes should be approved by the original design unit, shall not install any hang on the wall outside, protecting wall act the role of the surface on the periphery shall not destroy, be affected with damp be affected with damp or water seepage; Walls, roofs, floors, etc all kinds of insulation system includes decorative surface, strengthening layer and insulation layer shall be removed and weakened, can not have water seepage, etc.

Clear procedures, users in the use of steel structure in the process, shall not increase the floor and roof use the original design load. Property should be regularly maintenance steel structure wall and roofing waterproof layer, should guarantee the envelope system to normal use.

The expo steel structure building set great wisdomJiangnan shipyard ushered in the second life
http://chinasteelframe.blogspot.com/

2013年3月27日星期三

steel structure engineeringHelp the solid building expoThe expo in the lot of the venues are wonderful clips

steel structure engineeringHelp the solid building expoThe expo in the lot of the venues are wonderful clips. And the most impressive, is broad pavilion screening venues of live video.

Short film tells the broad pavilion in sight - a day to complete construction crane to lift the floor of the large, steel beam, a layer of laid in place, workers skilled up screw down the screws, in their heads at the same time began laying a new floor, Windows, walls, etc is done in the same way.

Movie ended, the audience gave the story of the thunder of applause construction speed of movies: complete build 6 floors in 24 hours, this is a miracle in the history of architecture. FuGuangXu said the big news center, the live video is in the expo garden high-rise residential area on the top floor, piece is compared with the clips and the effect after the fast forward.

Distance, broad pavilion by a white L and a pyramid building together and become, appearance is concise and simple. In the visual effect of the expo site, and without a sense of jing is colourful. But it is the simple venues, it is the cleanest air in the expo garden, aseismic rank highest venues.

Housing security is the key of the architecture design

Is located in puxi side of the great hall building itself is a exhibits. This 6 f has a new name can be built, the meaning of sustainable architecture.

Concrete manifestation is realized in the process of building the factory operation, mass production in the factory construction, minimize the site construction. The advantage is can save a lot of time, reduce the generation of construction waste. At the same time, the structural safety of building component can test again and again, until 9 degree seismic standards.

More than 200 years ago, the British invented the cement. From then on, the city with tall buildings. Support concrete and brick structure, is the construction of column and beam. Big construction project, it is the column, beam and singled out the keel structure, made of Steel structure warehouse. On the metope adornment on the basis of the steel structure.

This in only one day of completing 6 layer of steel structure building, because of its unique seismic design, through the national jianke institute earthquake research institute of 9 degree seismic testing, reached the highest current global seismic grade.

House in the future, no matter how novel and unique appearance of ideas, no matter how many new technologies, new materials, using safety of building structure is the most important. Great pavilion located near the earthquake house sustainable architecture gives people hope.

Unique brace can magnitude 9 earthquake resistant design

The seismic behavior of the wall, in order to guarantee sustainable architecture used in the original brace structure. The diagonal bracing is adopted in the construction Steel structure warehouse supporting force, and between the column and measure lines into the stability triangle.

Broad pavilion earthquake science and technology is the core principle, namely: brace + lightweight + factory. According to introducing, the destructive force of the earthquake is mainly horizontal thrust, pillars again strong also carry the horizontal thrust, the aseismatic capability can therefore be built.

First, is to rely on in the brace around the buildings and at regular intervals in the middle of the diagonal brace. Second, it is light weight. Strong earthquake damage = because x building self-respect, the greater the weight of the more destructive power. Broad pavilion using seismic average thickness of 30 mm of concrete floor, and traditional building about 100 to 200 mm. 50 layers can be built under the dead weight, if you include all materials and equipment, use of aseismic building 6 times lighter than traditional architecture of the floor above.

Third, it is factory. Earthquake-resistant buildings ceiling and the upper floor is close 2 for one, is a standard size, together with the concrete floor were completed in the factory, factory rate of 99%, and the construction waste is only 1%, can be assembled at the scene construction, not far-fetched and redundant, that is the core of the factory.

According to information, broad pavilion can fight the high intensity earthquake, from the building has a great magic weapon original three seismic, namely "brace, lightweight and factory. Museum no ordinary brick, with one floor on the top floor, the ceiling is 11.9 meters long, 3.9 meters wide, 3.9 meters thick, the unified specification, complete precast in factory assembly line.

Also because of this, all the materials enter the expo garden, not only created the miracle of construction completed in one day, and together the "9 degree seismic 5 times 6 times, material saving, energy saving, 1% of construction waste, 1% factory", become a has a strong technology based on sustainable architecture.

Enclosed buildings ventilation design about people's health

Make air conditioning from the broad group of have the absolute right to speak in terms of air purification. The world expo in the great hall of the ventilation design is very characteristic. The whole venue no air conditioning, but there are several air vents on the ground.

, new fan heat recovery ventilation exhaust quantity of cold (hot) for air cooling (heating). These vents have two functions: one is to adjust indoor temperature, the second is the indoor air circulation and outdoor air purification after discharge to indoor, so as to achieve the purpose of the clean air.

Great hall walls, the roof adopts 170 mm polymerization foaming insulation material; Windows USES the three layers glass plastic casing window, and is equipped with automatic window and the window shade heat insulation; Walls, Windows, ventilation, three aspects of "zero tolerance" heat insulation measures, make the building even without central heating in the winter nor too cold, summer air conditioning only to the human body, lighting and electrical heating, energy consumption is equivalent to only about 20% of the traditional architecture.

At the same time, it was a "breathing" ultra clean architecture. Indoor and ventilated good, thorough of 3 times, air changes per hour is more than twice as many as 5 star hotel also. In particular, due to the electrostatic precipitator were used of new turbines, outdoor air through the machine when indoors, 99.9% of the dust and bacteria will be filtered out.

A set of data can illustrate this: in the great venues, a liter of the dust in the air could be purified to about 1800, while outdoor dust in the air for as many as 300000.

At the end of the world expo 2010 Shanghai, most of the venues to dismantle. While broad pavilion removed intact, and reconstruction in other cities, this also is the perfect interpretation of "low-carbon expo".

At the same time, the great hall of the seismic exploration and seismic experience are warning people, prevent response to the earthquake disaster, we still have a lot to do.
Steel structure workshop building superior cost performanceIndustry in dongguan city construction metal structure association recently held a symposium on thinking
http://chinasteelframe.blogspot.com/2013/03/steel-structure-workshop-building.html

2013年3月26日星期二

Flat land and building Light steel structure simultaneously Long Yanlong excavator production project has in advance to play good foundationIs the construction of the monomerworkshop150000 square meters

Flat land and building Light steel structure simultaneously Long Yanlong excavator production project has in advance to play good foundationIs the construction of the monomerworkshop150000 square meters, annual output of 15000 units after the completion of the production scale will achieve series hydraulic excavator, annual output value over 5.5 billion yuan after the production of the dragon excavator production project has been in 15 days earlier than originally planned to play good foundation, steel structure material needed for the project also began gradually to the construction site in 15, and decided to start from 16 big steel structure.

Learned, in does not affect the overall project construction process under the premise of dragon excavator production project adopt the method of backward process carries on the reasonable arrangement of each part of construction, where to need more manpower in more investment. "This project since last year a mountain deep digging foundations, ground lightning protection of resettlement and land backfill successively, flat land and building steel structure at the same time, the whole construction process of formation of high quality high efficiency of try to overtake each other, really combined with the actual, insist on seeking truth from facts, making the construction project to super planned speed quick and good finish." Responsible for the dragon excavator production project production schedule and the person responsible for safety production Qiu Shuilin told me. Foundation as of 15 projects have been completed ahead of schedule, occupied a quarter of the land is flat and the total to 16 step-stone for steel structure.

In order to meet market demand, the dragon work put forward the "3581" excavator production targets, namely the production of 3000 units last year, the production of 5000 units this year, the production of 8000 units next year, the year after production of 10000 units. Therefore, dragon industry spend large manpower and material resources in longyan investment excavator production project, which is dragon in longyan one of the largest investment project. The project construction began in May this year, a total investment of 3.5 billion yuan, is expected to completed projects during the yearworkshopMain body construction, completed and put into operation in August 2011, after the project completed and put into operation, will implement the annual output of 15000 sets of excavators, annual output value of 5.5 billion yuan of above.
Northeast's first civil steel structure housing next mayThe autumn sunshine
http://freesteelstructuredesign.blogspot.com/2013/03/northeasts-first-civil-steel-structure.html

2013年3月22日星期五

Northeast's first civil steel structure housing next mayThe autumn sunshine

Northeast's first civil steel structure housing next mayThe autumn sunshine, tall tower crane is stretch long arms, almost 12 meters long steel column in the specified location. & other; Later, high strength bolt connect two pillar of steel together, and then welding, so, and there are four floors of the steel structure framework. Throughout the &; In shenyang I on September 14, baosteel group workers saemaul undong phase 3 Steel structure warehouse  The site of the project, the project manager Jin Liming told reporters. According to introducing, until the end of this month, there will be two 18-story buildings completed main body; In November, 8 building projects will all caps; In may of next year, 1008 residents can continue to live in the northeast's first civilianSteel structure housingA.

Workers in southwestern I village, covers an area of 1.2 square kilometers, has a residential building of more than 200 buildings, has a population of 14800 households, 45700. Most of the residential building was built in the early 1950 s, all three layers of stuffy head su shi red brick building, was the workers of the country's largest residential area. To the turn of the century, after nearly half a century of wind and frost snow rain, workers neglect village residential building aging, most of the pipes. In April 2000, shenyang municipal government announced to the world, took ten years to transform TieXi industrial zone. I the fate of the change, the worker also changes the face of village. In 2003, I began to government workers village old residential massive demolition and renovation, construction government subsidies type new residential area, the workers village former residents moved by all the way across & other; Workers saemaul undong & throughout; .

In April 2010, the workers for the construction of new village and turn a new page. On April 10, shenyang steel structure production base of modern architecture industry demonstration projects & ndash; & ndash; & ndash; Baosteel group workers - the third phase of steel structure residential projects started. A total construction area of 72000 square meters of eight homes belong to the government to reside a room, all residents are workers in the village of old people.

Steel structure residence is the representative of modern architecture industry projects, can be achieved by factory prefabrication production, reduce the environmental impact of construction site, building a house like & other; Building blocks & throughout; And subvert the traditional construction site & other; Dust ot & throughout; Concept, but also reduces the noise, dust nuisance problems. Said, the same steel structure residential building area compared with the traditional steel structure housing and the net area is about 5% more.

Construction site nearby green bush, former workers enjoy the village is very interesting to see their new homes were built in the future. While speaking, a resident must let the reporters know the what is the steel structure housing. Pointed at the site of the project post posters, he opened the chatterboxes, & other; Energy saving, environmental protection, aseismic, heat preservation, the old! We have to see one eye be free. Throughout the &; I said a staff member government & other Capacious and neat new residential instead of the old brick building, livable modern houses are walked into people's life, the life more comfortable, of course. Throughout the



http://chinasteelframe.blogspot.com/2013/03/chinas-huge-steel-structure-workshop.html

2013年3月20日星期三

Sixty years to the development of China's Light steel structure


Sixty years to the development of China's Light steel structure including building steel structure, bridge, tower mast, containers and hydraulic structure in various fields. Now is only house steel structure describes the development of 60 years.

Sheng in the early stage (50 ~ 60 s last century)

New China in 1949, the newly established his devastated when steel output is very low, only 1.35 million tons per year (now more than 500 million tons). Steel structure construction only rely on the Soviet economic and technical assistance, the Soviet union built 156 heavy industrial plants, including metallurgy, heavy machinery, aircraft, automotive and other industrial, such as anshan steel, wuhan steel, dalian shipyard, Harbin aircraft manufacturing plant and so on. In a short span of few years, a lot of steel structure construction industry workshop(steel column, steel roof truss and the crane beam), trained a large number of talents in design, manufacture, installation, to lay a solid foundation for future development.

Low water stage (the 70 s and 1960 s)

This period requirements increases the state departments of steel structure, steel production was still not much, only 20 million tons per year, countries put forward the policy of saving steel, some one-sided understanding of no steel structure at the time, so fewer steel structure. From the country as a whole, also built a few large steel structure engineering. Due to save policies, steel plate rack project is widely used, especially successful research welded hollow spherical node, small and medium span across the country are welding ball node plate rack abound, meanwhile bolt ball node network frame are also introduced.

Stage of development (in the 80 s ~ 80 s)

This 20 years should be a prosperous period of the development of the steel structure, due to the steel structure have some unique advantages, has become the main structure in construction project, especially the rising steel production, in 1997 1997 tons, to the development of our steel structure created there is a condition. In 1998 our country has been able to produce rolling h-beam, steel structure provides a new steel series, the steel structure engineering development mainly has the following several aspects.

& ndash; & ndash; Single layerworkshopFrame structure. The larger steel, seamless steel pipe, thermal power plant, etc. Its characteristic has a large area (200000 square miles), column height (50 meters), column spacing (48 meters), even across multiple across (8), large crane lifting weight (450 tons), etc.

& ndash; & ndash; The spatial structure. Flat space truss has been widely used large stadium, exhibition center, shopping mall, airport, station, warehouse, factory, etc. In particular, most of the 1990 Asian games venues have adopted welded hollow spherical nodes flat rack. Libraries in the capital Beijing, 1996 (153 m + 153 m and 90 m deep), four pyramid three layer network frame welding ball node. That same year 150 hangar taeco & times; 70 MiJianCheng, using unbonded manual sola lever arch at the gate.

& ndash; & ndash; Net shell of several projects. In 1994, tianjin gymnasium (D = 1994 m) double-layer spherical reticulated shell; Changchun stadium in 1997 (191.8 m) 146 meters & times; heilongjiang HuaBingGuan double square steel pipe network shell, 1995 (86.2 m & times; 191.2 m) on both ends of the central cylinder reticulated shell hemisphere shell. 1995 sichuan panzhihua gymnasium adopt eight side petal type double-deck net nanning, span of 60 meters, several times with prestress. This is the first time at home several times with prestressed concrete engineering. Was built in 1998 the Shanghai international gymnastic center the main hall, adopt aluminum alloy spherical reticulated shell, 68 meters in diameter. Network frame and net shell has a corresponding design procedures.

& ndash; & ndash; Cable structure. The structure development is slow, only a handful of engineering use, such as shandong zibo stadium (54 meters), anhui stadium (53 m & times; 72 m), wuxi stadium (43 meters) 40 meters & times; and jilin BingQiuGuan adopting different cable network system.

& ndash; & ndash; Space structure and the arch and rigid frame combined system is composed of concrete development such as the Asian games in Beijing shijingshan gymnasium (triangle, the length 99.7 meters), etc., is a hybrid structural system.

& ndash; & ndash; Membrane and the membrane structure. Get certain development since the late 90 s, is still in the continually expanding role, is very promising. Such as built in Shanghai in 1998 and 1998 stadium grandstand is the relatively large size of cable membrane structures.

& ndash; & ndash; High-rise building steel structure. High-rise building steel structure started relatively late, in 1987 the first 165 meters of shenzhen development center mansion, later the jingguang center 208 meters, 325 meters in shenzhen diwang building, 1996, 1999, Shanghai jin MAO tower 420 meters; In recent years, built in the Shanghai world financial center.

& ndash; & ndash; Light steel structure. Light steel structure is developing very fast, especially the door frame, such as industrial factory buildings, warehouses, cold storage, greenhouse, hotels, villas and so on to get a large number of applications. Light steel structure housing also began to research and experimental project, is very promising. This period steel structure specification and revised in 74, to 88 specification.

Strong period (s) 2009 years ago

Nearly 10 years of rapid development of the steel structure project of that range is wide, is unprecedented, is the major country of steel structure. Steel output was 400 million tons in 2006, the highest in the world, this also for our developmentsteel structure engineeringHave created favorable conditions.

Traditional space structure such as grids, continue to be heavily promoted net shell, etc. New space structure began to widely used, such as Zhang Xianliang, chord truss string and dome, etc. Shanghai pudong airport, Harbin exhibition center, Shanghai exhibition center, guangdong exhibition center, etc are more than 100 m copies string truss, it is also rare in the world. Especially space structure is adopted for a few games, the expo is more big, such as: the 2008 Olympic Games in Beijing new 37 venues, shandong jinan national games in 2009, the 2010 Shanghai world expo and guangzhou Asian games, the 2011 shenzhen universiade. Be worth what carry is the 2008 Olympic Games in Beijing 12 new venues, it represents the skill level of the steel structure in our country. National stadium (bird's nest) (& times; 292 meters 292 meters, consists of a series of door frame along the inner ring of the large span of space structure, the steel consumption of 42000 tons; national swimming center (water cube) (170 m & times; 70 m & times; 29 meters, special-shaped polyhedron grid structure); the national stadium, 144.5 meters (114 meters & times; bidirectional zhang chord truss structure); laoshan bicycle pavilion (133 m double layer spherical reticulated shell), wukesong gymnasium (120 meters 120 meters & times; two-way orthogonal is put truss composed of rack); Beijing industrial university gymnasium (badminton gymnasium (105 m chord dome); China agricultural university gymnasium (wrestling) (90 meters 90 meters & times; the door frame structure); Beijing university gymnasium (table tennis) 64 meters (64 meters & times; by 32 common radiation of truss string net shell) and other projects.

Shandong jinan 2009 national games main stadium, gymnasium, swimming pool and tennis center, the whole buildings adopt & other; Throughout east Netherlands XiLiu &; Building modelling, reflect the local characteristics of jinan, specifically have a stadium with 122 meters in diameter chord dome, will become the biggest span in the country and even the world chord dome structure.

The Shanghai world expo venue is spectacular. Which one axis and four pavilions (China pavilion, the expo center, theme pavilions, performing arts center) permanent buildings are very distinctive. Hundreds of other represent different creative national pavilion, enterprise pavilion building is also very worth visiting.

Except a few games and the expo venues, of course, there are worth questioning: Shanghai world financial center, the new terminal building of Beijing capital international airport, Beijing south railway station, national centre for the performing arts, China central television (CCTV) new sites, Shanghai south railway station, Beijing new poly plaza, zhengzhou international conference and exhibition center and nantong stadium, guangzhou TV tower, west tower, a new theatre, museums, etc. Engineering due to these characteristics, it also produced many new technology in steel structure manufacture and installation. Also emerged a large number of advanced steel structure enterprise at the same time, the steel structure industry for the future development is very favorable.

About steel structure residence, during this period due to policy support, engineering technical personnel's efforts, has made great achievements, the construction of the pilot project, the publication of technical specification has been carried out, have the right conditions for further development. Steel structure specification in 1988 and was replaced by 2003 specification, this year 2003 steel specification is revised, updated version of the standard one, two years can be realized.

The steel structure development vision in the future

The above description can be expected steel structure development vision in the future. & other; 11th five-year plan & throughout; During planning, the ministry of railways plans to build 548 station in one hundred, steel structure, civil aviation administration to invest heavily in plans to build 175 large airport terminal, all over the country provinces and cities also have vigorously construction of sports venues and conference and exhibition center planning. Now is approaching & other; The 12th five-year & throughout; The start of the implementation of, I believe that the further development of the steel structure of the development of our country will be more.


Wuhan international exhibition center Steel structure warehouse of the main hallThe national third

http://freesteelstructuredesign.blogspot.com/2013/03/wuhan-international-exhibition-center_19.html


2013年3月19日星期二

Wuhan international exhibition center Steel structure warehouse of the main hallThe national third

Wuhan international exhibition center Steel structure warehouse of the main hallThe national third, central China's largest comprehensive exhibition center, wuhan international exhibition center exhibition hall recently caps, more than 470000 square meters of exhibition hall 12 flowers blooming petals, like will wuhan sixin area particularly beautiful makeup dot.

Vice secretary of provincial party committee, wuhan municipal party committee secretary Yang Song, mayor of wuhan, ruan chengfa caps and other leaders attended the ceremony.

Wuhan international exhibition center exhibition hall is located in hanyang district four Lord, engineering covers an area of 900 mu, and by 12 chimes in modelling the single small pavilion, through building area of 475600 square meters, equivalent to four wuhan international conference and exhibition center, the area of the total cost is as high as 2 billion yuan. To be completed at the end of April next year.

Central China's largest exhibition center yesterday in han caps Yu Wuzhan pavilion area ten times

As the mayor of wuhan, ruan chengfa commanded, central China's largest international expo center hall the final piece of the steel structure in place. At this point, a made up of 12 "petals" architectural treasures, and in Bai Shazhou hanyang river under the bridge. In April of next year, the centre will open.

Wuhan international exhibition center in August last year, the project covers an area of 900 mu, the total cost is as high as 2 billion yuan, after the completion of indoor exhibition hall of 130000 square meters and 40000 square meters of exhibition hall outdoor, 7400 international standard booths, ten times the zhongshan park opposite of wu, is third, central China region's largest exhibition hall in China.

Wuhan international exhibition center exhibition hall by 12 chimes in modelling the single small pavilion, through like a huge "spray of molten steel. Each exhibition hall, exhibition hall are for large span no column height of 20 meters, the total amount of steel 27000 tons, so much of the steel girder - rack combination structure, are extremely rare in the country.

avilion is also rumoured to have just one phase of the project, then including conference center, four new holiday hotel, intercontinental hotel, Ocean Park, phase ii project, phase three, two high-rise office building project, etc. The project covers an area of 6000 mu, the development period of 15 years.

Jiangsu nantong yesterday cheung tsing sha 2 bridge steel structure construction"I declare
http://chinasteelframe.blogspot.com/2013/03/jiangsu-nantong-yesterday-cheung-tsing.html

2013年3月18日星期一

Shandong jining light building construction Olympic sports center will become southwest's largest sports venuesJining planning covers an area of about 55 hectares Olympic sports center

Shandong jining light building construction Olympic sports center will become southwest's largest sports venuesJining planning covers an area of about 55 hectares Olympic sports center, the whole project including sports venues, swimming, diving, outdoor sports facilities, etc. Can accommodate about 35000 people of the sports venues are being built, the modelling of unique interpretation of canal culture characteristics, will become the symbol of the new district of jining.

Olympic sports center prototype

24, the reporter comes to jining bayhood new Olympic sports center construction site is left when the workers are picking up tension construction.

Is responsible for the construction of Beijing urban construction group, told reporters, head of sports venues oval shaft 236 meters long and short axis of 215 meters, roofing for elliptical ring, metal roofing is 38.56 meters high, in the open area of 22937 square meters, the sellout crowd can accommodate about 35000 people.

"Here, low-lying after earthwork backfilling, here on the ground than the original by about 1.2 meters above the ground." Construction worker liu's teacher told reporters that when using a total of 50 double bridge transporters, 14 large excavator, four rollers, bulldozers 6, 85 type, construction, 24 hours a day for 10 days 200000 patch of backfill work was completed in time.

Jining Olympic sports center construction project construction team leader Kong Fan west said the main stadium roof purlin and wooden walls frame installation has been completed. Glass installation has been completed 80%, roof curtain wall has completed 40% overall progress. Lifting stage as well as sports technology will bid in the near future, next year is expected to completed in mid-may.

Fill the blank of the southwest

Ni BeiHuOu planning bureau chief, told reporters, according to the relevant national requirements, large sports venues must meet the requirements of energy conservation and environmental protection, so the shading of the building, lighting, sound insulation, heat insulation, waterproof, cleaning, indoor air distribution, etc are put forward strict requirements.

"Jining city for the construction of the Olympic sports center, will fill the blank of the southwest no large sports venues, as well as for the jining city environment and add a bright scenery line." Ni chief says.

Learned, around the sports venues, will also be building comprehensive gymnasium, swimming, diving, shooting range, etc., and outdoor playground, power area, a comprehensive management services and other supporting facilities. After the completion of the Olympic sports center will become the southwest's largest integrated sports venues, the intercontinental have received individual sport and national sport game, provincial comprehensive sports games, art performance and business conference and exhibition, etc.


Wuhan international exhibition center main stadium Steel Beam Fabrication Recently

http://freesteelstructuredesign.blogspot.com/2013/03/wuhan-international-exhibition-center.html

2013年3月17日星期日

Wuhan international exhibition center main stadium Steel Beam Fabrication Recently

Wuhan international exhibition center main stadium Steel Beam Fabrication Recently, located in the hanyang wuhan international exhibition center exhibition hall caps, the center is expected to open in April next year. The personage inside course of study says, the 7400 international standard booths wuhan biggest pavilions built, making wuhan to have a line of convention and exhibition city conditions.

For a line of exhibition city

"Because the pavilion co., LTD., a lot of customer requirement space-unit, result can't achieve, all be lost." Food expo this year at a news conference, the organizers of ostentatious, unavoidably some pity.

Wuhan show business scale is not big enough to have become the industry consensus. Wuhan international conference and exhibition center, vice general manager in the sign industry, according to the fifties and sixties of the last century, wuhan and Beijing, Shanghai, guangzhou and called China's four big exhibition center. But since the reform and opening, wuhan exhibition industry development lag. New arms exhibition after ten year of operation, its size and hardware facilities and transnormal rapid development with China's exhibition industry, the gap.

Three pavilions "each has specialize in"

We have learned, at present, is located in hankou of wuhan international exhibition center is one of the largest exhibition hall in wuhan, followed by science and technology convention and exhibition center is located in wuchang. At present, wuhan all kinds of exhibition and talent show is held every year, 200, basic held in international exhibition center.

Wuhan international conference and exhibition center, vice general manager in the sign industry forecast, in the future, wuhan pavilion will reposition: wuhan international exhibition center will give priority to in order to undertake large-scale TTF attending; Wuhan international convention &exhibition center will undertake within an area of 30000 square meters of small and medium scale exhibition, consumer life, to han economic and trade exchanges around the exhibition is given priority to; Science and technology exhibition center will be mainly small and medium-sized technology, academic, talent exchange exhibition.

It is understood that 10 times will Yu Wuzhan wuhan international exhibition center area. The personage inside course of study thinks, the expo center is completed in wuhan with a line of convention and exhibition city hardware conditions, wuhan can undertake international and domestic all kinds of large-scale exhibition. However, the development of exhibition economy will not happen overnight. Although the hardware is required, but need further integration of wuhan economy industrial chain, strengthen exhibition talent cultivation mechanism, introduce very large exhibition and high-end conference, making wuhan back to convention and exhibition cities at an early date.



http://chinasteelframe.blogspot.com/2013/03/tianjin-university-professor-chen.html

2013年3月14日星期四

Tianjin culture center: six big steel structure building first As a representative of the biggest cities in the future

Tianjin culture center: six big steel structure building first As a representative of the biggest cities in the future, tianjin culture center recently is very conspicuous, museum, library, art gallery, venues such as the caps. Within this year, six venues will successively complete the internal and external decoration and exhibition arrangement. Tianjin cultural center project at pingkiang, etc.counties road on the east, south, west to youyi road, park road on the north, covers an area of 90 hectares, the south will, in turn, distribution of tianjin library, museum, art gallery of tianjin, tianjin and the tianjin grand theatre four large cultural facilities. North side is the sun park, shopping center, underground also will be a transport hub project, since the second half of 2009 started in succession.

1 the tianjin grand theatre

The future: grand theater is located in the cultural center in the east side of the lake. Pro level stage, from the surface of the water from south to north in order to decorate the variety theater, theater and concert hall three major art venues. Within the floating roof set catering banquet functions. Variety theatre has 1600 seats, 1200 seats in the concert around the central band of the bandstand to decorate, the audience can enjoy wonderful performances from different angles. In the 400 - seat theater stage of hydraulic machinery can realize all kinds of stage arrangement, such as former stage, stage of island type, or for the fashion catwalk.

To: so far, the grand theater concrete structure complete, headed for the upper steel structure hoisting, completed by the end of eaves decorating inside and outside.

2 sunshine park

The future: sunshine paradise: the gross area is approximately 90000 square meters. Use & other layout; Clover & throughout; Form. In addition, the design will be combined with the planning of the subway site, will use the function is extended to a layer underground, form rich form inside the mall, meet the demand of a variety of activities. Sunshine park service object is given priority to with teenage children, with features of theme restaurants, souvenir sales and other commercial service facilities. Simulation design children's city area of more than 10000 square meters, is for children aged 4-13 real experience social and role playing a wonderful park. Here is a simulation of urban social life, including in all walks of life and urban facilities, such as: airports, police department, fire department, Banks, hospitals, courts and other dozens of simulated experience venues.

To: before the Spring Festival, the sun park project concrete subject project successfully completed, implement all caps, after more than half a year's time, this & other; Clover & throughout; Modelling of the sunshine park shows.

3 galaxy shopping center

The future: the galaxy shopping center by two unique and interrelated building shape form: one is a cube in the shape of a retail business; Second is located in the south can be reflected in the pond and waterfall in sculpture sex and artistic quality of the lens. Shopping center includes retail, large self-service shopping, eating, entertainment. Its interior design through the concept of the galaxy, in combination with internal 4 new atria, respectively to join & other; Moon and stars & throughout; Four topics.

To: galaxy shopping center has entered the stage of the main body construction, completed by the end of eaves decorating inside and outside.

4 the tianjin library

The future: tianjin library construction area of 55000 square meters, underground and five floors on the ground, building is a large open space of the asymmetric. First set the north and south throughout the existent space, with two open large entrance and north lake square, the south city space interconnection, people are free to go to the library. In addition, set the total reception along the corridors, information center, as well as the lecture hall, restaurant, cafe and a bookshop, children with reading rooms for the disabled. Decorate in the 2, 3 layer the Chinese books, magazines, newspapers and so on open-shelf reading room. Other features include: library 3 layer on the lecture rooms, 4 electronic data access layer, audio-visual information query, such as space, 5 layers reference reading room, reading room project, etc. The library is located in the underground. Future it will be within the library, the haihe river park of tianjin library series, three collections of books together can reach more than 12 million copies and become the largest capacity and one of the largest library. In services, but also it will open 24 hours, and with the aid of the Internet to achieve barrier-free library.

To: on February 7, library steel structure main body project completion. At present, the construction crew is gearing up for the basement and interior construction, ensure the timely delivery.

5 tianjin museum of art

Future: tianjin art gallery building area of 28000 square meters, here not only has eight meters high thematic exhibition hall, and gymnasium ZhanXian reached more than 3000 linear meter, more than seven large-scale exhibitions are held at the same time, we will be in tianjin, the first modern and contemporary integrated modelling art museum, five years to collect fine art pieces and above.

To: steel structure main body have already complete.

6 tianjin museum

The future: the new tianjin museum covers an area of about 18000 square meters, building area of 64000 square meters. Museum in & other; The window of the century & throughout; Concept as the basis, in the north main entrance & other; Six layer heavy doors & throughout; Guided by the public across the lake in the square in the library later, will be in 30 meters wide, 80 meters long and 14 meters high & other; Throughout the time tunnel &; , which is to connect the public hall hall. The museum will be located 1 sequence and 16 independent exhibition hall hall, reception capacity of up to 1.5 million people. The museum galleries have 15, 200000 collection of cultural relics.

To: tianjin museum of steel structure implementation main body cap, took more than two months, only a total steel quantity of 12000 tons. After the Spring Festival, the museum will begin to take the lead in entering the secondary structure construction, both inside and outside decoration engineering will also be carried out.


Qingdao bay bridge steel structure joining tomorrow through into the world's

http://freesteelstructuredesign.blogspot.com/2013/03/qingdao-bay-bridge-steel-structure.html

2013年3月13日星期三

Qingdao bay bridge steel structure joining tomorrow through into the world's

Qingdao bay bridge steel structure joining tomorrow through into the world's longest sea bridgeQingdao bay bridge on December 26, 2006 in huangdao contract period of the tenth to play down the side a bored piles, lasted nearly four years of time, to achieve the success of Qingdao to huangdao connection. Next year, according to the plan at the end of may, civil engineering, pavement, guardrail, expansion joints, residence buildings, charging system, etc. All projects must be completed and opened to traffic conditions, built in the first half of the year. Qingdao bay bridge is the construction length of the longest sea bridge in the world, the total length of 41.58 kilometers, is China's first offshore interchanges - red island interchanges. Bridge will be after the completion of the shandong peninsula blue economic zone and an important transport hub, Qingdao narrowing of space and time distance between Qingdao, red island, huangdao.

To build the country's first sea interchange

The bay bridge in addition to section 26.75 km of the sea, there are two beautiful sea interchange overpass, respectively is red island interchange overpass and Li Cunhe interchange overpass. Two bridge, only red island interchange overpass completely located on the sea, it is the first offshore intersection. Li Cunhe interchange overpass is only half is located in the sea, and the other half of land in the highway.

Overpass the subject has been completed, now red island overlooking from the sea, lies the magnificent scene of the jiaozhou bay bridge have been rendered. Red island interchange overpass using hundreds of bridge pier, the span of each bridge pier is 50 meters, covers an area of more than is currently using the connection of the qingdao-yinchuan highway, heilongjiang road, 204 national highway, chongqing north road, shenyang liuting interchange in highway viaduct, etc.

Red sea island of interchange overpass used in the process of building the largest span sliding formwork casting box girder, minimum radius of curve, worked 15 hours pouring, pouring concrete of 520.54 cubic meters. Pouring across the lines 60 meters sliding formwork box girder in B ramp, with small radius of 350 meters, 60 meters of long-span curved sliding formwork construction design technology in China.

Install the strongest coefficient of anti-collision guardrail

Qingdao bay bridge and approach of the overall scale and connecting cables for the domestic first. Because the sea wind is stronger, bridge safety fence is 1.45 meters high, collision coefficient is up to the national highest level. Construction personnel said: "the bay bridge guardrail barrier will be the strongest." Bay bridge to traffic safety performance is the key of the design of bridge, the bridge guardrail set up a special team for planning and design considering there will be many large container car traffic, Qingdao bay bridge guardrail height is higher than general bridge, at the same time base and internal steel frame Are required to strengthen the design, can say 50 tons of truck hit the fence, guardrail will not broken off, before installation is collision experiment was carried out within the relevant scientific research institutions.

In addition, the guardrail on the appearance design, also the function of preventing vertigo. Bridge guardrail light resistant design, also in the middle of the night driving, two-way traffic even if the bright lights are also won't interfere with each other.

Qingdao to huangdao save 20 minutes

The reporter understands, Qingdao bay bridge will open to traffic in June 2011, will open the Qingdao bay bridge along with all the observation deck, for tourists stop to take pictures. Viewing platform located between Qingdao and huangdao red island, can accommodate hundreds of thousands of tourists visited.

Will be after the completion of the bridge of Qingdao bay bay "ring protection, hold development" strategy of the important transport hub, nearly 30 km from Qingdao to huangdao will shorten the distance, to save time for 20 minutes, greatly alleviate the traffic pressure of Qingdao jiaozhou bay highway, further improve Qingdao cross-sea traffic contact, expanding of Qingdao city skeleton, narrowing of space and time distance between Qingdao, red island, huangdao, strengthen the contact vice city downtown area with two wings, shape the embrace of jiaozhou bay of Qingdao city framework, for the deep development of Qingdao city expand a new space.

S for background information

"The world's first bridge" (41.58 km)

Shandong expressway group invest in the construction of Qingdao bay bridge is a single state-owned enterprise in our country at present the largest investment in the construction of transport infrastructure project, is the freezing waters of the north China's first super-large bridge cluster project, plus approach span and cables, the overall size of bridge is one of the largest in the world. Engineering more than 41.58 km, 28.880 km in the first stage construction, the second phase is 12.7 kilometers. This bridge is a two-way six-lane highway and urban expressway eight-lane, design speed of 80 km/h, bridge width of 35 m, design reference period of 100 years.

Qingdao bay bridge project, is by the Qingdao franchise mode of government, facing the world of public bidding. Shandong expressway group with good reputation, strong capital and technical strength and rich experience in construction management at the bidding, become the project entity, for Qingdao bay bridge franchise in 25 years. The franchising period, Qingdao bay bridge and the jiaozhou bay expressway has been built to bind operation. The engineering budgetary estimate of 9.53 billion yuan.

Bridge began planning study from April 1993, has experienced early planning, can, can, set, shop drawing design and tendering stage, to start over 13 years and eight months, including both academicians, changjiang scholars, hundreds of Chinese and foreign experts and scholars pay the wisdom and sweat for the bridge.



http://chinasteelframe.blogspot.com/2013/03/henan-media-building-steel-structure.html

2013年3月12日星期二

The successful completion of the China metallurgical construction research tianjin samsung project of steel structure production

The successful completion of the China metallurgical construction research tianjin samsung project of steel structure production tasksRecently, the China metallurgical construction research the successful completion of the steel structure branch of tianjin samsung N Fworkshoproject 8 ~ 15 axis component production tasks, and will be scheduled on November 4th all shipments to the construction site. China metallurgical construction grinds the cooperation with samsung, once again won the high praise.
Tianjin samsung NF master workshopA total of 15 axis, production period shall begin on the September 22, a total of 45 days, the China metallurgical construction to grind steel structure branch for 8 ~ 15 axis of about 2200 tons of component production tasks. Project site installation part of the production tasks for all bolt connection, connection board, large amount of drilling. According to preliminary estimates, in the factory the connection hole of components and the scene connection plate hole total amounted to more than 140000. On production technical difficulties, China metallurgical construction steel structure branch, relying on management technology advantages, make full use of existing equipment and existing staff's biggest potential, reasonable arrangement of two CNC plane drilling machine working 24 hours a day, every day to ensure product quality and quantity to complete production tasks.
In the process of production, due to the material to plant late, drawing changes, the project actual processing cycle in just over a month. Equipped with reasonable arrangement in the production line employees in the company, at the completion of follow-up jia Ming hotel engineering, scientific research test part of the building foundation pit supporting projects, 101 projects at the same time, the successful completion of the tianjin samsung project Steel structure production Tasks, meet the requirements of the owner for the construction period, quality, once again made a satisfactory answer, developed for China metallurgical construction owners subsequent cooperation with South Korea laid a good foundation.

let heavy steel frame structure engineering

http://freesteelstructuredesign.blogspot.com/2013/03/let-heavy-steel-frame-structure.html

2013年3月11日星期一

let heavy steel frame structure engineering


let heavy steel frame structure engineering Reasonable into people's heart Since the reform and opening up, along with iron and steel production in China, gradually improve the steel structure engineering construction has been rapid development, a lot of representativesteel structure engineeringBuilding has reached the world advanced level.

However, in the steel structure engineering construction rapid development while hiding many problems, which directly affect thesteel structure engineeringThe healthy development of the building, but people often because these problems to ensure strict plan approval system steel structure engineeringQuality, in the country's energy industry policy impetus,steel structure engineeringAs a kind of recycled building materials, is widely used in the stadium, exhibition center, bridge, railway station room, garage, such as construction, along with the rapid development of China's construction industry.steel structure engineeringIn the proportion of the increased year by year, and at the same time, also attracted many foreign architect, among them, some foreign architects take China as the birthplace of dreams, they in the design blindly pursue building modelling novel unique, in order to ensure that the use of construction safety, it is necessary to establish a more reasonable, more comprehensive, more fair, more fairsteel structure engineeringMechanism.

In recent years, thesteel structure engineeringBuilding a rapid development at the same time, the difficulty of design is more and more big, however, at present our country design institutesteel structure engineeringThe overall level of architectural design request is more and more high. improvesteel structure engineeringThe design level is the guaranteesteel structure engineeringThe healthy development of the construction market premise, therefore, we should improve the level of steel structure building design to the industry development of the important agenda, at presentsteel structure engineeringThe market is stable, steel structure building brought many positive influence, steel structure building is a systematic project, from the design stage began to consider, however, the price of steel is not very stable, letsteel structure engineeringBuilding fabrication and construction enterprise bear certain pressure. So thatsteel structure engineeringConstruction enterprises do know fairly well, reasonable judgmentsteel structure engineeringCost to makesteel structure engineeringReasonable into people's heart.


The world's largest span single main cable oblique boom anchor type steel framedome suspension bridge will be built
http://chinasteelframe.blogspot.com/2013/03/the-worlds-largest-span-single-main.html



2013年3月10日星期日

The steel structure building environmental advantages are more popular steel frame buildings

The steel structure building environmental advantages are more popular steel frame buildings Regulations, civil high-rise steel structure disgn rocedures, building fire protection design procedures, residential building design specifications, etc. The technical level and standard uneven, and the further research and development and design the economic and reasonable wide promotion value of steel structure system.

Second, the market demand not achieve industrialization degree, related products functional single, industrialization level is not high, the product quality can not meet the standard requirement of housing industrialization.

Third, constructional steel is corrosive and fire resistance the demand is higher, the data shows, without any protection of ordinary steel once encounter corrosion and fire, 15 - and in the rain will soften. The United States and 9 middot; 11th, let people more focus on steel structure building fireproof performance.

Housing industrialization is the only way for the development of housing industry in China, and will become a new growth point to promote the economic development of our country. Although our country years steel production has up to 120 million t, but the steel products in construction steel structure of the proportion of use is less than 1%. Therefore, our country government proposed, by 2005 construction steel structure material to achieve the national steel production in 2010, from 3% to 5%. Ministry of construction and the relevant departments to set up a leading group for the construction steel, its main task is to promote in the building with the proportion of steel. At the same time, the ministry of construction steel structure housing has been included in the national key promotion project, Beijing, Shanghai, tianjin, etc, have built a batch of steel structure housing demonstration, pilot project. With the development of productive forces, people to the improvement of quality of life, the steel structure housing will be the country's focus on the development of object, in the future in the engineering construction on leading role.


China steel structure bridge more and more recognized by the world


2013年3月8日星期五

China steel structure bridge more and more recognized by the world

China structural steel h beam sizes bridge more and more recognized by the worldBridge construction industry, equipment manufacturing industries such as after the second world war by the United States to Europe, Japan, South Korea, China and these countries also has the disparity, but through the technology research, has made considerable progress. We the gap with developed countries still there, especially in the new materials, equipment and testing standard and so on many aspects needs to be improved. There are fifty countries want China to give high iron technology and construction of support. China is currently with the United States, Britain, Russia, Brazil and the Middle East and other countries to discuss the cooperation of high speed railway, the cooperation project implementation will greatly speed up the China rail transit equipment enterprise internationalization process.
Due to the complicated structures, construction difficulty, the relevant person in charge and who said: New bay bridge the bridge completed perfect in the world market have a bridge. And throughout Chinese academy of engineering someone said: and who New bay bridge project hard-won, this let zhenhua heavy industry in steel bridge to be built on a new step. And throughout The current international economic environment for China's equipment manufacturing industry enterprise develop overseas market to create the opportunity, the enterprise should be solid practice internal work, improve the manufacturing process and the level of technology, improve product visibility and reputation, and actively take the international market. With the innovation of science and technology, key technology and international standard research and other aspects of research, in from Britain, Japan, South Korea's numerous competition to hand out.

China steel structure bridge more and more recognized by the world
China's large equipment manufacturing is the world more and more recognition from shipbuilding, high iron to drilling platform, steel structure bridge, the world market more and more and who Made in China and throughout Figure. July 9, 2011, the world's largest bulk carrier and capacity of super large ore carrier (VLOC) in China rshi shipbuilding base out of the dock. Because of China's enterprise manufacturing of rail transit equipment with complete varieties, high cost performance and after-sale service system and so on many kinds of advantages, in the future of the global market share will be further improved. Ordering party Brazilian iron ore giant CVRD in 2008 and China rshi signed in Shanghai to build 12 vessels super-large ore carrier contract, totaled $1.6 billion, too, a single pen shipbuilding order amount world record.
China's heavy equipment manufacturing industry development is rapid, but it starts late, in the international market, China's equipment manufacturing enterprise is neither the advantages of market share, and the lack of awareness and brand effect. New bay bridge is the world's first big tower from anchor seismic suspension SuoGang structure bridge, bridge main channel bridge span is 565 m, steel tower total about 160 meters high, can ensure that every 300000 cars in the world, it is through the bridge through the ability. The world similar steel structure bridge in the highest technical difficulties, cost the most expensive steel bridge project, which was completed, it will become the landmark in the west coast of the United States. (China building materials first network


268 meters high walk experience the world's highest all steel rafter tower
http://chinasteelframe.blogspot.com/2013/03/268-meters-high-walk-experience-worlds.html


  • structural steel beams housing: need policy support

    Steel structure housing: need policy supportThe 2011-6-10 10:43:28 signature: this version on April 14, 2011 published and who Steel structure: the sustainable development of the housing industry and strong spine throughout Penny, cause widely discussed in the industry. How to promote China's large structural steel beams Over the years, to become the industry experts and structural steel beams Research and development department common concern. In this paper, such as a large number of development to the steel structure housing, need a series of policy support, I hope that this view can be promote the rapid development of the steel structure housing a good recipe.
    Steel structure housing in more than ten years of development process, met many problems. Whether steel structure manufacture enterprise or real estate development enterprise, do not have the steel structure housing as the main force of the housing market. In fact, the steel structure housing is the most can realize residential industrialization of a residential building way, it's not a lot of promotion, the fundamental problem is the lack of related policy support. In addition, the related departments and no will and who People-oriented and throughout Implement the concept of our housing market.
    Deepening the policy guidance to strengthen industry legislation
    In China, to vigorously promote the steel structure housing, first of all, shall establish unified organization, set up system promotion plan.
    Secondly, in the legislation, the relevant departments to formulate relevant laws and regulations to promote the development of the steel structure housing, such as who and The steel structure housing industry resource construction planning & throughout For the steel structure housing industrialization of land resource, energy saving, environmental protection and development provides a legal basis, and who Steel structure housing industrialization base construction method and throughout In promoting the healthy development of the steel structure housing industrialization a demonstration effect. Clear the central government and local government in the steel structure housing supply responsibility, formulate plaintext law that local governments often should pay attention to the jurisdiction of the residential areas of the subordinate status. Make steel structure housing industry system technology development subsidy system, such as research and development to the steel structure housing enterprise provide a certain amount of research funding assistance, and who Steel structure housing industrialization funds and throughout For the steel structure housing industrialization to promote rapid development to provide financial support, the government should support the small and medium-sized enterprise in this research.
    Finally, establish and make effective steel structure housing industrialization, financial support policy. Establish and who Steel structure housing industrialization special fund and throughout , reduce the low-income housing loan interest, take fund institution "one-stop" work style, integration and economic means. The use of fiscal and financial means, create the steel structure housing industry fund mode, to the steel structure housing manufacturing enterprise and ordinary residents provide long-term low-interest loans, all citizens to buy steel structure housing in the standards prescribed by the state, all within to and who Steel structure housing industrialization special fund and throughout Apply for low-interest loans. Through a series of fiscal and monetary system's implementation, the correct guidance enterprise, make its research direction and the policy of the government guide phase with established steel structure housing technology policy implementation. The government subsidies and financing system is the national guidance and management of the construction of the steel structure housing industry is an important way, not only can apply for the individual, the local government also can be in residential construction funds shortage and who apply for Steel structure housing industrialization special fund and throughout And the steel structure housing private enterprise can also through to and who Steel structure housing industrialization special fund and throughout Apply for long-term low-interest loans. For some certain types of steel structure housing, such as aging residential, energy-saving residences, still can apply for special financial subsidies or low-interest loans.
    Complete set product to establish the relevant specification
    Steel structure housing in the process of development meet the most prominent problem is supporting problems, such as wall material research work, the purpose is to meet the production requirements of the wall products; Promote economy applicable, construction simple floor, the purpose is to reduce the cost of the steel structure housing; To strengthen the scientific research work of nodes, the purpose is to reduce the welding work in construction can, simple installation, so as to save the time.
    At present, in China to develop the steel structure housing, it is urgent to establish a wide range of this agreement. We can from the establishment of the relevant specification, the steel structure housing industrialization and standardization direction to advance. In the industrialized housing era, it is important to the factory and production line. In the unified standards and specifications, under the guidance of establishment conforms to the market demand of steel structure housing system, in order to meet the housing market multiple needs. With the guidance of standardization, the establishment of the construction and quality management system, improve the steel structure housing construction efficiency, reduce the cost, the advantages of steel structure residence truly play out. Therefore, it is urgent to research the independent innovation of intellectual property rights technology and formulation and industry adapt to the standard and norm system.
    In addition, attention should also be paid to the steel structure housing interdisciplinary education and training of technical personnel. The environmental protection consciousness of the architect, artistic accomplishment, social responsibility and the steel structure processing, manufacturing, installation process of familiar degree, directly affect the whole process of the steel structure housing construction. Improve the quality of the professional team, to ensure that the steel structure housing performance, quality and improve the efficiency of building lay a good foundation.
    For industrialization ground strengthening base construction
    To speed up the steel structure housing industrialization base construction, and the construction is to solve the sustainable development of the society and effective ways and the best solution. Steel structure housing industrialization base should have the functions: one is the research and design of the steel structure housing integrated system and a complete system of the part; Two is the study of the steel structure part, pressure type steel plate and wall materials processing and installation; Three is the research and the steel structure housing of supporting the inside and outside the walls and floor system; Four is to develop and who Steel structure housing industry general modulus standard & throughout , through the module standard realize accessories generalization to ensure that different manufacturer member of generality, Five is to develop and who Steel structure housing product design catalogue and throughout As the center to promote universal system development; Six is the general part called & who Steel structure housing department product catalogue and throughout , each manufacturer can be listed in their products and who Steel structure housing department product catalogue and throughout , designers can arbitrarily choose general list of product design; Seven is the steel structure housing modular coordination, narrow finalize the design unit, standardization and diversification better unify, the steel structure housing industry building part of standard gradually into the standard. Proof of foreign experience, to change the backwardness of the residential construction, it is necessary to promote housing industrialization, go high scientific and technological content, good economic returns, low resources consumption, little environmental pollution, human resources can be fully used the new industrialization road.
    The so-called housing industrialization, is through the way of industrialization production house, construction of high efficiency, low cost. To be specific, housing industrialization is the housing market demand as the guide, building materials, light industry, etc, supported by factory producing all kinds of residential components and finished products, semi-finished products and field assembly, and the talents of science and technology as the means, through the whole process of housing production design and components production, construction, sales and after-sale link connection for a complete industrial system, so as to realize the housing production, supply, sales integration of the production and business operation organization form. Accelerating housing industrialization, is not only guarantee the quality of residential and improve labor productivity, and the need to save resources and reduce the cost of the need, but also shorten the construction period and improve labor condition needs.
    In our country promote housing industrialization, one is to establish promote the industrialized housing mechanism; The second is to develop and promote all kinds of advanced technology, Three is to cultivate and support backbone enterprise: four is to use demonstration project guide; The fifth is to make effective technical and economic policy.
    In addition, the need to further speed up the steel structure housing industrialization base construction, broaden and who Steel structure green energy-saving residential building system and throughout Technology in the application of real estate development, creating and who The green building, science and technology, real estate and throughout To promote our country housing industrialization process, in order to promote the recycling economy and building a harmonious society contribution strength. (China construction news)


    space truss structure engineering hold up well



  • 2013年3月7日星期四

    space truss structure engineering hold up well


    space truss structure engineeringHold up wellAll are driving the landmark buildingsteel structure engineeringIndustry speed up, in our country there are many famous insidesteel structure engineeringBuilding, recently the world firststeel structure engineeringTV tower have been satisfactorily completed, it is understood the steel structure tower is the landmark building of henan. No matter in domestic or overseas this kind of famoussteel structure engineeringBuilding, will becomesteel structure engineeringIndustry speak good.
    In the low carbon economy in China under the pursuit of green building desire more intense, building industrialization is to realize low carbon building, green production, and the important waysteel structure engineeringArchitecture is an important way to realize industrialization of construction industry,steel structure engineeringWith convenient installation, reduce wet operations, steel resources recycling, saving labor costs and so on various advantages insteel structure engineeringChina building industry occupies an important position.steel structure engineeringIn the residential construction industrialization, Japan, the United States, Australia and other countries has become the most typical. In order to promote the development of green building in our country, our country live JianBu also will adopt a series of encouraging policies to promotesteel structure engineeringThe development of the industry.
    The new government will advocate upgrade demand a lotsteel structure engineeringConstruction, this means that the world's factory in the future prospects, edge development side upgrades, also bring strongsteel structure engineeringBuilding needs,steel structure engineeringWill gradually narrowing the gap compared with the cost, the future commercial real estate, etc will have large-scale usesteel structure engineeringHot spot,steel structure engineeringAs a representative steel structure industry will make a comeback point of view.


    Quanzhou bay steel structure cross-sea bridge this month has now started ring high-speed prototype
    http://chinasteelframe.blogspot.com/2013/03/quanzhou-bay-steel-structure-cross-sea.html




    2013年3月6日星期三

    steel construction can't ignore the use of fire retardant coating


    steel construction  can't ignore the use of fire retardant coating Although now a lot of buildings will use steel structure framework for building. But because of the special steel material performance, a lot of time need to pay attention to the anticorrosion properties. So fire coatings used insteel structure engineeringIn the middle, is a necessary process.
    Fire coating for steel structure building put on and who Protective clothing and throughout
    Steel structure building with rapid economic development, China construction steel structure since the 1990 s to get more and more widely accepted and used. modernsteel structure engineeringChina is the important content of large-scale modern buildings. Due to the steel structure has its light dead weight, basic low cost, suitable for soft foundation and easy to install, construction fast, the construction period is short, less pollution, good resistance to shock, and other comprehensive advantages, so steel structure building by the ministry of construction as promotion project. But in recent years, steel structure building fire accident frequency, the CCTV new site fire event for people again was a wake-up call.
    China construction metal structure association XueFa senior experts believe that steel structure building fire prevention is always the focus industry experts, China's steel structure building fire protection technology has advanced foreign, at present widely used method is: putSteel structure fireaint coating in steel component surface, with a view to play a fire insulation protection, prevent the steel products in the fire temperature quickly and reduce intensity, avoid steel structure lose support ability and lead to building collapse. At present,Steel structure fireaint the research, production and application of more and more be taken seriously.
    As we have learned, our country fireproof paint production enterprise after twenty years of development has begun to take shape, the production enterprise development to 250 above, but in many of the fireproof paint production enterprise, enterprise scale, management level and technical level is uneven, the high quality product rarely. In many production enterprises, only more than half of the enterprise through the ISO9000 quality system certification. The survey found that the domestic market sales of fireproof paint products are common problems: fire performance low, easy to fall off, decorative poor, poor durability and quality is not stable.
    At present, the domestic steel structure building more, in order to achieve fire requirements, the owner may not have the imported steel structure fire retardant paint, using imported fireproof paint though can achieve fire requirements, but nearly 70000 yuan 1 tons of cost price let builders pain in the neck. For fireproof paint is concerned, the key lies in the reasonable formula and production process.
    Construction steel structure corrosion nots allow to ignore
    After years of development, at present, the steel structure building industry vigorous development, however, the relevant laws and regulations, standards and the promulgation of the relative lag, in recent years in the steel structure building and many problems in, such as the 1998 in zhejiang happen tens of thousands of square meters of light steel plant and individual network engineering collapse accident; Somewhere a span of 70 meters of space truss structure engineering, after five years use suddenly overall collapse. The accident in addition to design, production, installation problems outside, steel structure corrosion is a very serious problem.
    XueFa said,steel structure engineeringThe owners, users, design and construction of the enterprise on the steel structure of the protection problems are the lack of enough attention, in consciousness still stay in the traditional anti-corrosion technology. Due to the material and construction technology choice improper, often causing premature steel structure corrosion or damage. At present, whether project owners, users or constructor for construction how to detect the performance of anticorrosive coating, basic downplay. In addition, some engineering owner completely according to graph and decide, in the project before start, did not find special anticorrosive engineering experts to evaluate the whole engineering anticorrosion scheme, no delegate professional anti-corrosion construction engineer or experts to anticorrosive coating for strict inspection, all to the project supervision. Project supervision on corrosion resistance of comprehension is also according to graph and decide, project delivery after use basic no corrosion maintenance detection, and regardless of the actual conditions of the large cut the cost of the anticorrosion engineering, all of these make steel structure life shortens greatly. Comprehensive of the world to the steel structure building protection practice proof, with heavy anti-corrosion coatings and be carried out anti-corrosive coating with fire anti-corrosion coatings on fire anti-corrosion coating is the most economic and effective, the most simple and practical, the most popular a kind of method.
    Construction steel structure to improve the long-term protection technology
    XueFa think, the steel structure anticorrosion technology, especially long-term anticorrosion technology is very important. Anticorrosion design life is 30 years, according to the different environment of indoor and outdoor use different anticorrosion coating. In fact coating system is made up of two different structure coating combination and become, include electrochemical protection of zinc rich primer, scaly natural cloud iron mainly intermediate paint, paint a skeletal support function and shielding performance is remarkable. Epoxy paint have good adhesion, abrasion resistance, water resistance, resistance to chemicals, other varieties coating have far more.
    At present, the countries all over the world to building fire problem has certain value and introduced the corresponding fire safety requirements. Such as the United States two layer below the lower house refractory limit is 30 minutes. For fire rating requirements, according to different actual situation, each country has its own standard. Will China's actual situation, combined with the overseas experience, XueFa advice, because the Chinese property concept is stronger, in the fire, people not only to escape, and fire, rescue property, this would be a waste of time. So to make the residence with steel structure specification cannot copy foreign standards, and combined with the actual conditions in China work out suitable product standard.
    In short, steel structure building to be popular in China, but also need to solve the technology and production process of the many problems, especially in fire anti-corrosion, should further increases the research and development dynamics, steel structure building as soon as possible to solve the problem of fire.


    steel building structures engineeringHealthy development

    2013年3月5日星期二

    steel building structures engineeringHealthy development


    steel building structures engineeringHealthy development roadSince the reform and opening up, along with iron and steel production in China, promoted step by stepsteel structure engineeringConstruction has been rapid development, a lot of representativesteel structure engineeringBuilding has reached the world advanced level, however, insteel structure engineeringWith the rapid development of building while hiding many problems, which directly affect thesteel structure engineeringThe healthy development of the building, but people often because these problems to ensure strict plan approval systemsteel structure engineeringQuality, in the country's energy industry policy impetus,steel structure engineeringAs a kind of recycled building materials, is widely used in the stadium, exhibition center, bridge, railway station room, garage, such as construction, along with the rapid development of China's construction industry.steel structure engineeringIn the proportion of the increased year by year, and at the same time, also attracted many foreign architect, among them, some foreign architects take China as the birthplace of dreams, they in the design blindly pursue building modelling novel unique, in order to ensure that the use of construction safety, it is necessary to establish a more reasonable, more comprehensive, more fair, more fairsteel structure engineeringMechanism.
    In recent years, thesteel structure engineeringBuilding a rapid development at the same time, the difficulty of design is more and more big, however, at present our country design institutesteel structure engineeringThe overall level of architectural design request is more and more high. improvesteel structure engineeringThe design level is the guaranteesteel structure engineeringThe healthy development of the construction market premise, therefore, we should improve the level of steel structure building design to the industry development of the important agenda, at presentsteel structure engineeringThe market is stable, steel structure building brought many positive influence, steel structure building is a systematic project, from the design stage began to consider, however, the price of steel is not very stable, letsteel structure engineeringBuilding fabrication and construction enterprise bear certain pressure. So thatsteel structure engineeringConstruction enterprises do know fairly well, reasonable judgmentsteel structure engineeringCost to makesteel structure engineeringReasonable into people's heart. (Internet)
    Kunming subway station steel structures design stand top has been completed
    http://chinasteelframe.blogspot.com/2013/03/kunming-subway-station-steel-structures.html