The huge building no longer drab, in it above, a section by dozens of large steel structure interlaced supporting network has been formed; The light small facilities not thin, in its interior, various kinds of advanced mechanical and electrical equipment are installed.
. Here, is the wanzhou swimming pool. This time, the project construction of most of the content is into the final stage. Yesterday, reporters here again, feel here the latest change & hellip; & hellip;
Links:
... Wanzhou swimming pool is located in the big river valley stadium side, in the northeast of the north shore of the Yangtze river road, every green belts and facing southeast, southwest and the planning road, in the northwest of wanzhou stadium. Project construction scale and content is: covers an area of about 71 mu, built 1500 seat serie b swimming TiaoShuiGuan a and underground garage, the building area is about 18500 square meters. The audience fixed position 1463. Swimming pool main functions including swimming, diving competition hall, training, paddle hall, auditorium, athletes, competition related functional rooms, VIP room, and stores, coffee shop and independent business facilities.
... Steel structure weave up supporting network
... The reporter sees in the spot, in the swimming pool above, bunches of steel structure has been across the entire swimming pool in the sky, all cover. In the steel structure, and a few workers are engaged in welding work. Site construction personnel to tell a reporter, steel structure deadweight ten several tons, lifting up, even between transverse welding work, the force each other, thus playing a role in supporting the whole.
... Steel structure is to use more than 200 tons of large crane lifting up, for the small steel tube parts, it is used on the crown block workers. The reporter sees in the spot, aerial work of the workers in the steel structure fixed good crown block, the workers use wire rope tied steel or aluminum alloy parts, rerun the machines will be rope tightening, such parts will rise to the high altitude. The reporter understands, at present the swimming pool Steel structure construction There are 2 product steel structure without lifting, have completed most of the project.
... Electrical and mechanical equipment installation is stepping up
... According to the field controller introduces, the swimming pool project involves many areas of building science. Yesterday reporters into the building interior field had a bug. Along the is not spacious stairway, the reporter first climb high stand, stand on it, and can see the whole swimming pool. Standing in the highest one stand, look down reporters felt a little afraid.
... In the lower part, in fact has a spacious space. The workers use the space, isolation out greatly small a lot of room. The middle one is spacious corridor, both sides is all kinds of room. The room has a new color. In the bottom of the swimming pool, is the parking lot and equipment center. In the center of equipment installation site, the technician is to some equipment installation work. The reporter understands, wanzhou swimming pool game, training and the water splashing water purification equipment all adopt the most advanced water treatment equipment, thus for athletes training and the masses to provide fitness the environmental health of good environment and conditions.
... And who As a professional swimming pool, the water treatment is very important content! And throughout The chief introduction. The reporter understands, water circulation system is the heart of swimming pool, it is very important. Its function is to the swimming pool to meet the health conditions and suitable temperature of water, in order to meet the needs of swimming. Its working principle is: to circulating pump is the power, through the pipe with municipal hydraulic fill up the pool, and then the water of the swimming pool after hair filter, quartz sand pressure filter, filtering, heating plate heat exchanger, ongoing cycle, at the same time, dosing device to circular tube dosing, make swimming pool water accords with the health, water temperature requirements.
... Energy conservation and environmental protection building materials
... The reporter understands, natatorium roof and rear will use the alloy plate, not only light, and environmental protection. And right ahead will use glass curtain wall, glass curtain wall is a new type of contemporary wall, it endows the building with the biggest characteristic is the architectural aesthetics, building function, building energy efficiency and building structure factors organically combine, buildings from different angles present a different tone, with sunshine, moonlight, lighting changes give a person with dynamic beauty.
... Swimming pool glass curtain wall is made of metal materials do supporting structure system, through the metal fittings and fasteners will surface glass firmly fixed on it, very safe, reliable, and at that time, people can clearly see through glass supporting glass whole structure system. The reporter understands, this kind of glass curtain wall it can absorb infrared, reduce into indoor solar radiation, reduce indoor temperature. In the hot summer, double glazing unit can block 90% of the solar heat. Use hollow glass curtain wall of the room can be warm in winter and cool in summer, greatly improving the internal air environment.
All steel structure frame shenyang green indoor stadium blasting eight seconds
http://chinasteelframe.blogspot.com/2013/02/all-steel-structure-frame-shenyang.html
没有评论:
发表评论